2009 Street Maintenance Program

Street maintenance

Follow the latest news - Engineering Blog

In the City of Dublin we are improving the way you live and work. Respondents to the 2008 Community Survey listed roadwork and traffic improvement as one of their top goals for Dublin. Now we are acting. The following streets have been selected to be resurfaced:


View 2009 Street Maintenance Program in a larger map

Locations for Improvements

  1. Muirfield Drive

  2. Glick Road, Concord Road, St. Boswels Court

  3. Leith Drive

  4. Reserve Drive, Kittiwake Court, Chaffinch Court, Stonechat Loop

  5. Springburn Drive, Macewen Court, Saltcoats Court, Maclntyre Drive

  6. Orchard Crest Court, River Knolls Place

  7. Tuller Road

  8. Dublin Center Drive, Banker Drive

  9. Spring Hill at South High Street, Pedestrian Ramps

  10. Waterford Drive, Stonefence Court, Karrer Place

  11. Rings Road at Frantz Road: Brick Pavers

  12. Edinburg Road, Perth Drive, Caldy Court

  13. Phoenix Park Drive, Oisin Court, Newgrange Drive

  14. Shier Rings Road: Bike Path

  15. Woerner Temple Road: Bike Path

 

During resurfacing you can expect any of the following actions:

  1. Removal of all or part of the existing asphalt surface.

  2. Replacment of deteriorated curbs.

  3. Repair of storm drainage inlets.

  4. Replacment of existing asphalt pavement with a new asphalt surface.

  5. Restoration of tree lawns behind the new curb with topsoil and seed.

  6. Installation of new ADA accessible sidewalk ramps where existing sidewalk is located at the street intersections.

If you have any concerns throughout the process please call 614-410-4625. We will be working diligently to restore your street as soon as possible.

 

Submit a Repair Request or Service Follow up

Page Last Updated: Feb 05, 2010