<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Engineering</title>
	<atom:link href="http://dublin.oh.us/engineering/blog/feed/" rel="self" type="application/rss+xml" />
	<link>http://dublin.oh.us/engineering/blog</link>
	<description>City of Dublin Engineering</description>
	<lastBuildDate>Wed, 16 May 2012 11:10:35 +0000</lastBuildDate>
	<generator>http://wordpress.org/?v=2.9.1</generator>
	<language>en</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
			<item>
		<title>Corbins Mill @ Bridge Street Paving to begin May 16, 2012</title>
		<link>http://dublin.oh.us/engineering/blog/2012/05/corbins-mill-bridge-street-paving-to-begin-may-16-2012/</link>
		<comments>http://dublin.oh.us/engineering/blog/2012/05/corbins-mill-bridge-street-paving-to-begin-may-16-2012/#comments</comments>
		<pubDate>Wed, 16 May 2012 11:10:35 +0000</pubDate>
		<dc:creator>dlee</dc:creator>
				<category><![CDATA[Street Maintenance]]></category>
		<category><![CDATA[Traffic Advisory]]></category>

		<guid isPermaLink="false">http://dublin.oh.us/engineering/blog/?p=315</guid>
		<description><![CDATA[Corbins Mill Paving work will begin May 16, 2012 and run through Wednesday May 23, 2012.
The construction limits are from Bridge Street south to the back entrance of the Shopping Center.
]]></description>
			<content:encoded><![CDATA[<p>Corbins Mill Paving work will begin May 16, 2012 and run through Wednesday May 23, 2012.<br />
The construction limits are from Bridge Street south to the back entrance of the Shopping Center.</p>
]]></content:encoded>
			<wfw:commentRss>http://dublin.oh.us/engineering/blog/2012/05/corbins-mill-bridge-street-paving-to-begin-may-16-2012/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Hirth Road Paving to Begin Tuesday May 15, 2012</title>
		<link>http://dublin.oh.us/engineering/blog/2012/05/hirth-road-paving-to-begin-tuesday-may-15-2012/</link>
		<comments>http://dublin.oh.us/engineering/blog/2012/05/hirth-road-paving-to-begin-tuesday-may-15-2012/#comments</comments>
		<pubDate>Mon, 14 May 2012 16:54:23 +0000</pubDate>
		<dc:creator>dlee</dc:creator>
				<category><![CDATA[Street Maintenance]]></category>
		<category><![CDATA[Traffic Advisory]]></category>

		<guid isPermaLink="false">http://dublin.oh.us/engineering/blog/?p=313</guid>
		<description><![CDATA[Paving work will begin May 15, 2012
The Paving work will run through Friday, May 25, 2012
There will be a 3-5 day period of inactivity following the roadway stabilization for the roadbase to cure.
]]></description>
			<content:encoded><![CDATA[<p>Paving work will begin May 15, 2012<br />
The Paving work will run through Friday, May 25, 2012<br />
There will be a 3-5 day period of inactivity following the roadway stabilization for the roadbase to cure.</p>
]]></content:encoded>
			<wfw:commentRss>http://dublin.oh.us/engineering/blog/2012/05/hirth-road-paving-to-begin-tuesday-may-15-2012/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Adventure Drive Paving To Begin May 15</title>
		<link>http://dublin.oh.us/engineering/blog/2012/05/adventure-drive-paving-to-begin-may-15/</link>
		<comments>http://dublin.oh.us/engineering/blog/2012/05/adventure-drive-paving-to-begin-may-15/#comments</comments>
		<pubDate>Mon, 14 May 2012 16:51:50 +0000</pubDate>
		<dc:creator>dlee</dc:creator>
				<category><![CDATA[Street Maintenance]]></category>
		<category><![CDATA[Traffic Advisory]]></category>

		<guid isPermaLink="false">http://dublin.oh.us/engineering/blog/?p=311</guid>
		<description><![CDATA[Asphalt Paving work will begin on Adventure Drive from Tara Hill to Fitzgerald on May 14, 2012
Paving will continue on Adventure Drive through Friday, May 18, 2012.
]]></description>
			<content:encoded><![CDATA[<p>Asphalt Paving work will begin on Adventure Drive from Tara Hill to Fitzgerald on May 14, 2012<br />
Paving will continue on Adventure Drive through Friday, May 18, 2012.</p>
]]></content:encoded>
			<wfw:commentRss>http://dublin.oh.us/engineering/blog/2012/05/adventure-drive-paving-to-begin-may-15/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Hemingway Village Road Construction</title>
		<link>http://dublin.oh.us/engineering/blog/2012/05/hemingway-village-road-construction/</link>
		<comments>http://dublin.oh.us/engineering/blog/2012/05/hemingway-village-road-construction/#comments</comments>
		<pubDate>Mon, 14 May 2012 11:10:53 +0000</pubDate>
		<dc:creator>dlee</dc:creator>
				<category><![CDATA[Street Maintenance]]></category>

		<guid isPermaLink="false">http://dublin.oh.us/engineering/blog/?p=309</guid>
		<description><![CDATA[Adventure Drive:  Installation of New Curb Ramps and Sidewalks to begin 5-14-2012
Faulkner Way, Fitzgerald Road, Tralee Drive:  Removal of existing Curb and Guttter sections
]]></description>
			<content:encoded><![CDATA[<p>Adventure Drive:  Installation of New Curb Ramps and Sidewalks to begin 5-14-2012<br />
Faulkner Way, Fitzgerald Road, Tralee Drive:  Removal of existing Curb and Guttter sections</p>
]]></content:encoded>
			<wfw:commentRss>http://dublin.oh.us/engineering/blog/2012/05/hemingway-village-road-construction/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Curb Removal &#8211; Adventure Drive, Faulkner Way and Fitzgerald</title>
		<link>http://dublin.oh.us/engineering/blog/2012/05/curb-removal-adventure-drive-faulkner-way-and-fitzgerald/</link>
		<comments>http://dublin.oh.us/engineering/blog/2012/05/curb-removal-adventure-drive-faulkner-way-and-fitzgerald/#comments</comments>
		<pubDate>Sat, 05 May 2012 14:50:07 +0000</pubDate>
		<dc:creator>dlee</dc:creator>
				<category><![CDATA[Street Maintenance]]></category>

		<guid isPermaLink="false">http://dublin.oh.us/engineering/blog/?p=307</guid>
		<description><![CDATA[Friday and Saturday May 4 and MAy 5, 2012:
Curb removal to continue on Adventure Drive
Curb removal to begin on Fitzgerald and Faulkner Way
]]></description>
			<content:encoded><![CDATA[<p>Friday and Saturday May 4 and MAy 5, 2012:<br />
Curb removal to continue on Adventure Drive<br />
Curb removal to begin on Fitzgerald and Faulkner Way</p>
]]></content:encoded>
			<wfw:commentRss>http://dublin.oh.us/engineering/blog/2012/05/curb-removal-adventure-drive-faulkner-way-and-fitzgerald/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Corbins Mill Drive</title>
		<link>http://dublin.oh.us/engineering/blog/2012/05/corbins-mill-drive/</link>
		<comments>http://dublin.oh.us/engineering/blog/2012/05/corbins-mill-drive/#comments</comments>
		<pubDate>Tue, 01 May 2012 11:03:17 +0000</pubDate>
		<dc:creator>dlee</dc:creator>
				<category><![CDATA[Street Maintenance]]></category>

		<guid isPermaLink="false">http://dublin.oh.us/engineering/blog/?p=305</guid>
		<description><![CDATA[Concrete Curb and Gutter will be installed along the South Side of Corbins Mill Drive May 1, 2012
]]></description>
			<content:encoded><![CDATA[<p>Concrete Curb and Gutter will be installed along the South Side of Corbins Mill Drive May 1, 2012</p>
]]></content:encoded>
			<wfw:commentRss>http://dublin.oh.us/engineering/blog/2012/05/corbins-mill-drive/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Roscommon Road, May 1, 2012</title>
		<link>http://dublin.oh.us/engineering/blog/2012/05/roscommon-road-may-1-2012/</link>
		<comments>http://dublin.oh.us/engineering/blog/2012/05/roscommon-road-may-1-2012/#comments</comments>
		<pubDate>Tue, 01 May 2012 11:02:29 +0000</pubDate>
		<dc:creator>dlee</dc:creator>
				<category><![CDATA[Street Maintenance]]></category>

		<guid isPermaLink="false">http://dublin.oh.us/engineering/blog/?p=303</guid>
		<description><![CDATA[Concrete Curb and Gutter installation May 1 and May 2, 2012
]]></description>
			<content:encoded><![CDATA[<p>Concrete Curb and Gutter installation May 1 and May 2, 2012</p>
]]></content:encoded>
			<wfw:commentRss>http://dublin.oh.us/engineering/blog/2012/05/roscommon-road-may-1-2012/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Construction to begin on:Roscommon Drive, Tralee Drive, Dinglebay Ct. and Erin Isles Ct.</title>
		<link>http://dublin.oh.us/engineering/blog/2012/04/construction-to-begin-onroscommon-drive-tralee-drive-dinglebay-ct-and-erin-isles-ct/</link>
		<comments>http://dublin.oh.us/engineering/blog/2012/04/construction-to-begin-onroscommon-drive-tralee-drive-dinglebay-ct-and-erin-isles-ct/#comments</comments>
		<pubDate>Tue, 24 Apr 2012 19:50:28 +0000</pubDate>
		<dc:creator>dlee</dc:creator>
				<category><![CDATA[Street Maintenance]]></category>

		<guid isPermaLink="false">http://dublin.oh.us/engineering/blog/?p=301</guid>
		<description><![CDATA[Curb and Gutter repairs will beigin on:
Roscommon Drive, Tralee Drive, Dinglebay Ct. and Erin Isles Ct.
Starting Wednesday, 4/25/2012 with removal of existing curb and gutter
]]></description>
			<content:encoded><![CDATA[<p>Curb and Gutter repairs will beigin on:<br />
Roscommon Drive, Tralee Drive, Dinglebay Ct. and Erin Isles Ct.<br />
Starting Wednesday, 4/25/2012 with removal of existing curb and gutter</p>
]]></content:encoded>
			<wfw:commentRss>http://dublin.oh.us/engineering/blog/2012/04/construction-to-begin-onroscommon-drive-tralee-drive-dinglebay-ct-and-erin-isles-ct/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>2012 Street Maintenance Program &#8211; Construction to Begin April 24, 2012</title>
		<link>http://dublin.oh.us/engineering/blog/2012/04/2012-street-maintenance-program/</link>
		<comments>http://dublin.oh.us/engineering/blog/2012/04/2012-street-maintenance-program/#comments</comments>
		<pubDate>Thu, 19 Apr 2012 12:51:26 +0000</pubDate>
		<dc:creator>dlee</dc:creator>
				<category><![CDATA[Street Maintenance]]></category>

		<guid isPermaLink="false">http://dublin.oh.us/engineering/blog/?p=296</guid>
		<description><![CDATA[Construction to begin on Adventure Drive with Curb and Gutter removal beginning on April 24,2012.
]]></description>
			<content:encoded><![CDATA[<p>Construction to begin on Adventure Drive with Curb and Gutter removal beginning on April 24,2012.</p>
]]></content:encoded>
			<wfw:commentRss>http://dublin.oh.us/engineering/blog/2012/04/2012-street-maintenance-program/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
	</channel>
</rss>

